42hz
RE&D·Kingston Solar
24h
87.5%
wo-039
warn

DSTATCOM-2 cooling pump diagnosis

Enclosure #2 cooling pump P-2 fault — diagnose and restore. DSTATCOM-2 in standby until cleared.

Details

Due

2026-04-27T18:00:00.000Z

Assignee

Linked alarm

a-198

Work Order Copilot

Ask, take notes, or change the record

I can summarize the work order, change its status, assign it, or log a note. Try: