42hz
RE&D·Kingston Solar
24h
87.5%
wo-038

T1 bushing PF test (annual)

Annual bushing power-factor test on T1. Sched window confirmed.

Details

Asset

T1

Due

2026-05-08T18:00:00.000Z

Assignee

Work Order Copilot

Ask, take notes, or change the record

I can summarize the work order, change its status, assign it, or log a note. Try: